ORA-16219: This database is not preparing to switch over. ORACLE 报错 故障修复 远程处理

文档解释

ORA-16219: This DATABASE is not preparing to switch over.

Cause: The database was not preparing to switch over. Therefore, it was not possible to cancel the SWITCHOVER command.

Action: Preparing for the SWITCHOVER command can be accomplished with the ALTER DATABASE PREPARE TO SWITCHOVER command.

ORA-16219:这个数据库没有准备好进行切换。

官方解释

常见案例

一般处理方法及步骤

香港美国云服务器首选后浪云,2H2G首月10元开通。
后浪云(www.IDC.Net)提供简单好用,价格厚道的香港/美国云服务器和独立服务器。IDC+ISP+ICP资质。ARIN和APNIC会员。成熟技术团队15年行业经验。

THE END